It was evident with the performance of Advance Erosion Solutions, Inc on our US-59 project, that AES is the best erosion control contractor I have worked with in my career. I appreciated the desire to execute the contract (seeding, installation of BMP’s, etc.) right the first time and have a sense of pride doing so. The 85,000 sqyd of erosion blanket AES installed is already a success. A clear stand of vegetation is growing in all the mats and we will be able to release our NOI permit early this summer, which without your performance would have been a pipe dream.